5-47
V-BELT AUTOMATIC TRANSMISSION
EAS31437
INSTALLING THE PRIMARY SHEAVE
ASSEMBLY, SECONDARY SHEAVE
ASSEMBLY AND V-BELT
1. Apply:
• Sealant
(onto the inner V-belt case seal)
2. Install:
• V-belt case air duct joint clamp “1”
• V-belt case air duct “2”
TIP
• Align the projection “a” in the V-belt case air
duct “2” with the slot “b” on the V-belt case air
duct joint clamp “1”.
• Align the projection “c” in the V-belt case air
duct “2” with the slot “d” in the inner V-belt case
“3”.
3. Install:
• Primary fixed sheave “1”
• V-belt “2”
• Secondary sheave assembly “3”
NOTICE
ECA22160
Do not allow grease to contact the V-belt, pri-
mary and secondary sheave.
TIP
• When installing the belt, screw M6 (more than
45 mm (1.77 in)) bolts “4” to spread apart the
secondary sheave and then install the V-belt.
Make sure to install the V-belt with the arrow
facing in the direction shown.
• Install the V-belt and secondary sheave as-
sembly then pass the V-belt the primary
sheave side.
• Align the “a” and “b” during reassembly.
4. Tighten:
• Secondary sheave nut “1”
TIP
While holding the secondary sheave with the
sheave holder “2”, tighten the secondary sheave
nut.
Yamaha bond No. 1215
90890-85505
(Three bond No.1215®)
3
3
2
4
4
1
b
1
a
2
2
c
d
3
Secondary sheave nut
90 N·m (9.0 kgf·m, 66 lb·ft)
Sheave holder
90890-01481
1
2
a
3
4
4
b
T
R
.
.
1
2
Summary of Contents for XP560D
Page 1: ...2020 SERVICE MANUAL TMAX TMAX TECH MAX XP560EL XP560D B3T 28197 20 ...
Page 2: ......
Page 6: ......
Page 8: ......
Page 42: ...2 13 CABLE ROUTING EAS20021 CABLE ROUTING Headlight bracket front view ...
Page 44: ...2 15 CABLE ROUTING Front cowling assembly rear view ...
Page 46: ...2 17 CABLE ROUTING Frame right side view front ...
Page 48: ...2 19 CABLE ROUTING Frame right side view rear ...
Page 50: ...2 21 CABLE ROUTING Frame left side view front Q ...
Page 52: ...2 23 CABLE ROUTING Rear frame left side view center ...
Page 54: ...2 25 CABLE ROUTING Frame left side view rear ...
Page 56: ...2 27 CABLE ROUTING Frame top view front ...
Page 58: ...2 29 CABLE ROUTING Frame top view rear ...
Page 60: ...2 31 CABLE ROUTING Handlebar top and left side view for XP560E ...
Page 62: ...2 33 CABLE ROUTING Handlebar front view for XP560E ...
Page 64: ...2 35 CABLE ROUTING Handlebar top and left side view for XP560D ...
Page 66: ...2 37 CABLE ROUTING Handlebar front view for XP560D ...
Page 68: ...2 39 CABLE ROUTING Front brake front left side and right side view Q ...
Page 70: ...2 41 CABLE ROUTING Frame right side view front ...
Page 72: ...2 43 CABLE ROUTING Rear brake right side view rear ...
Page 74: ...2 45 CABLE ROUTING Fuel tank right side view ...
Page 76: ...2 47 CABLE ROUTING Fuel tank left side view ...
Page 78: ...2 49 CABLE ROUTING Fuel tank top view ...
Page 80: ...2 51 CABLE ROUTING Air filter case and throttle body left side view ...
Page 82: ...2 53 CABLE ROUTING Radiator right side view ...
Page 84: ...2 55 CABLE ROUTING Radiator left side view ...
Page 86: ...2 57 CABLE ROUTING Radiator top view ...
Page 88: ...2 59 CABLE ROUTING Hydraulic unit assembly top and front view ...
Page 90: ...2 61 CABLE ROUTING ...
Page 297: ...5 62 CLUTCH 1 3 2 ...
Page 317: ...5 82 CRANKSHAFT 2 1 2 1 2 4 3 ...
Page 320: ...5 85 TRANSMISSION ...
Page 336: ...6 15 WATER PUMP ...
Page 352: ...7 15 THROTTLE BODY ...
Page 355: ......
Page 371: ...8 16 ELECTRIC STARTING SYSTEM ...
Page 377: ...8 22 CHARGING SYSTEM ...
Page 393: ...8 38 SIGNALING SYSTEM ...
Page 399: ...8 44 COOLING SYSTEM Replace the ECU and or meter as sembly ...
Page 405: ...8 50 FUEL PUMP SYSTEM ...
Page 414: ...8 59 GRIP WARMER SYSTEM for XP560D OK Replace the meter assembly ...
Page 415: ...8 60 GRIP WARMER SYSTEM for XP560D ...
Page 421: ...8 66 SEAT HEATER SYSTEM for XP560D ...
Page 427: ...8 72 SMART KEY SYSTEM Replace the remote control unit ...
Page 485: ...9 11 SYSTEM DIAGRAM ...
Page 682: ......
Page 683: ......
Page 684: ......