16
CARBURETOR
FUEL
Step
Procedure / Part name
Q’ty
Service points
1
2
3
4
5
6
7
8
9
10
CARBURETOR DISASSEMBLY
Carburetor assembly
Bolt
Collar
Diaphragm assembly
Float arm
Needle valve assembly
Body assembly
Main jet
Pilot jet
High speed screw
Low speed screw
4
2
2
2
2
2
2
2
2
2
Follow the left “Step” for removal.
Refer to “CARBURETOR REMOVAL”.
Reverse the removal steps for
installation.
1 Nm (0.1 m
kg, 0.7 ft
lb)
4 Nm (0.4 m
kg, 2.9 ft
lb)
5 Nm (0.5 m
kg, 3.6 ft
lb)
2 Nm (0.2 m
kg, 1.4 ft
lb)
2 Nm (0.2 m
kg, 1.4 ft
lb)
1 Nm (0.1 m
kg, 0.7 ft
lb)
CARBURETOR
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART