CHECKING THE STARTER MOTOR
1. Check:
• Commutator
Dirt
→
Clean with 600 grit sandpaper.
2. Measure:
• Commutator diameter “a”
Out of specification
→
Replace the starter
motor.
3. Measure:
• Mica undercut “a”
Out of specification
→
Scrape the mica to the
proper measurement with a hacksaw blade
that has been grounded to fit the commutator.
TIP
The mica of the commutator must be undercut to
ensure proper operation of the commutator.
4. Measure:
• Armature assembly resistances (commutator
and insulation)
Out of specification
→
Replace the starter
motor.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Measure the armature assembly resistances
with the digital circuit tester.
b. If any resistance is out of specification, re-
place the starter motor.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
5. Measure:
• Brush length “a”
Out of specification
→
Replace the brushes
as a set.
6. Measure:
• Brush spring force
Out of specification
→
Replace the brush
springs as a set.
Commutator diameter
22.0 mm (0.87 in)
Limit
21.0 mm (0.83 in)
Mica undercut (depth)
1.50 mm (0.06 in)
a
Digital circuit tester
90890-03174
Model 88 Multimeter with ta-
chometer
YU-A1927
Armature coil resistance
0.0315–0.0385
Ω
Insulation resistance “2”
No continuity (Above 1 M
Ω
at 20
°C (68 °F))
Brush overall length
9.5 mm (0.37 in)
Limit
3.50 mm (0.14 in)
1
2
a
Summary of Contents for MBK MW125 2014
Page 1: ...SERVICE MANUAL MW125 2014 MW125F 2015 2CM F8197 E0...
Page 6: ......
Page 8: ......
Page 49: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 20...
Page 52: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 23 EAS30021 LUBRICATION DIAGRAMS 1 3 2...
Page 53: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 24 1 Oil strainer 2 Oil pump assembly 3 Camshaft...
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25 2 3 4 5 1...
Page 56: ...COOLING SYSTEM DIAGRAMS 2 27 EAS20020 COOLING SYSTEM DIAGRAMS 1 2 4 3 5 6 9 8 3 4 5 7...
Page 60: ...CABLE ROUTING 2 31 Steering head left side view A A A A 1 2 2 2 1 1 2 1 2 1 2 B...
Page 62: ...CABLE ROUTING 2 33 Front wheel left side view 1 2 1 1 1...
Page 63: ...CABLE ROUTING 2 34 1 Speed sensor lead 2 Front brake hose...
Page 66: ...CABLE ROUTING 2 37 Front frame right side view...
Page 70: ...CABLE ROUTING 2 41 Front frame left side view 1 2 3 4 5 6 7 8 9 10 A 4 7 5 6 11 13 12...
Page 74: ...CABLE ROUTING 2 45 Front frame top view 1 2 3 4 2 3 4 5 6 12 10 11 13 7 8 8 9 A 2 3 5 4 6...
Page 76: ...CABLE ROUTING 2 47 Rear frame top view 1 2 3 4 5 6 7 8 9 10 11 12 13 14 A B...
Page 78: ...CABLE ROUTING 2 49...
Page 81: ......
Page 205: ...ENGINE INSPECTION 5 2 10 Install Center cover Refer to GENERAL CHASSIS 1 on page 4 1...
Page 248: ...V BELT AUTOMATIC TRANSMISSION 5 45 a 1 2...
Page 270: ...CRANKSHAFT 5 67...
Page 282: ...WATER PUMP 6 11...
Page 287: ...FUEL TANK 7 4 Refer to INSTALLING THE FUEL TANK on page 7 2...
Page 296: ...THROTTLE BODY 7 13...
Page 298: ...IGNITION SYSTEM 8 1 EAS20072 IGNITION SYSTEM EAS30490 CIRCUIT DIAGRAM...
Page 302: ...ELECTRIC STARTING SYSTEM 8 5 EAS20073 ELECTRIC STARTING SYSTEM EAS30493 CIRCUIT DIAGRAM...
Page 307: ...ELECTRIC STARTING SYSTEM 8 10...
Page 308: ...CHARGING SYSTEM 8 11 EAS20074 CHARGING SYSTEM EAS30496 CIRCUIT DIAGRAM...
Page 311: ...CHARGING SYSTEM 8 14...
Page 312: ...LIGHTING SYSTEM 8 15 EAS20075 LIGHTING SYSTEM EAS30498 CIRCUIT DIAGRAM...
Page 316: ...SIGNALING SYSTEM 8 19 EAS20076 SIGNALING SYSTEM EAS30500 CIRCUIT DIAGRAM...
Page 322: ...FUEL INJECTION SYSTEM 8 25 EAS20078 FUEL INJECTION SYSTEM EAS30504 CIRCUIT DIAGRAM...
Page 349: ...FUEL INJECTION SYSTEM 8 52...
Page 366: ...ELECTRICAL COMPONENTS 8 69...
Page 375: ...SELF DIAGNOSTIC FUNCTION AND DIAGNOSTIC CODE TABLE 9 8...
Page 377: ......
Page 378: ......