
THROTTLE BODIES
7-9
5. Adjust:
• Throttle bodies synchronizing
Out of specification
→
Replace the throttle
bodies.
Refer to “SYNCHRONIZING THE THROT-
TLE BODIES” on page 3-8.
EAS21010
CHECKING THE THROTTLE BODY JOINTS
1. Check:
• Throttle body joints “1”
Cracks/damage
→
Replace.
EAS1MC1067
REPLACING THE THROTTLE BODIES
1. Remove the throttle bodies from the vehicle.
2. Install a new throttle bodies to the vehicle.
3. Reset:
• ISC (idle speed control) learning values
Use the diagnostic code number “67”.
Refer to “SELF-DIAGNOSTIC FUNCTION
AND DIAGNOSTIC CODE TABLE” on page
9-5.
4. Adjust:
• Throttle bodies synchronizing
Refer to “SYNCHRONIZING THE THROT-
TLE BODIES” on page 3-8.
5. Place the vehicle on the centerstand so that
the rear wheel is elevated.
6. Check:
• Engine idling speed
Start the engine, warm it up, and then mea-
sure the engine idling speed.
EAS1MC1073
INSTALLING THE INJECTORS
NOTICE
ECA1MC1022
• Always use new O-rings and seals.
• When checking the injectors, do not allow
any foreign material to enter or adhere to
the injectors, fuel rail, O-rings, or seals.
• Be careful not to twist or pinch the O-rings
when installing the injectors.
• If an injector is subject to strong shocks or
excessive force, replace it.
• If installing the original fuel rail and screws,
remove the white paint marks using a
cleaning solvent. Otherwise, paint chips on
the screw seats could prevent the screws
from being tightened.
1. Install new O-rings and seals onto the end of
each injector.
2. Install the injectors “1” to the fuel rail “2”.
3. Install the injector assemblies to the throttle
bodies.
4. Check the injector pressure after the injectors
are installed to the throttle bodies.
Refer to “CHECKING THE INJECTOR
PRESSURE” on page 7-9.
EAS1MC1074
CHECKING THE INJECTOR PRESSURE
TIP
• After installing the injectors, perform the follow-
ing steps to check the injector pressure.
• Do not allow any foreign materials to enter the
fuel lines.
1. Check:
• Injector pressure
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Connect the injector pressure adapter “1” to
the fuel rail “2”, and then connect an air com-
pressor “3” to the adapter.
b. Connect the pressure gauge “4” to the injec-
tor pressure adapter “1”.
Engine idling speed
1000–1100 r/min
1
1
T
R
.
.
Fuel rail screw
5 Nm (0.5 m·kg, 3.6 ft·lb)
2
1
New
Summary of Contents for FJR1300A(D)
Page 1: ...2013 SERVICE MANUAL FJR1300A D 1MC 28197 E0 ...
Page 6: ......
Page 8: ......
Page 70: ...SPECIAL TOOLS 1 61 ...
Page 101: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Page 104: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 106: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Page 107: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 108: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Page 110: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Page 112: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Page 116: ...COOLING SYSTEM DIAGRAMS 2 45 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Page 124: ...CABLE ROUTING 2 53 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Page 132: ...CABLE ROUTING 2 61 Rear fender top view 1 2 3 B C A B ...
Page 138: ...CABLE ROUTING 2 67 ...
Page 141: ......
Page 377: ...MIDDLE GEAR 5 76 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Page 428: ...WATER PUMP 6 15 ...
Page 455: ...IGNITION SYSTEM 8 6 ...
Page 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Page 465: ...CHARGING SYSTEM 8 16 ...
Page 477: ...SIGNALING SYSTEM 8 28 ...
Page 533: ...FUEL INJECTION SYSTEM 8 84 ...
Page 551: ...CRUISE CONTROL SYSTEM 8 102 ...
Page 555: ...FUEL PUMP SYSTEM 8 106 ...
Page 563: ...ACCESSORY BOX SYSTEM 8 114 ...
Page 573: ...IMMOBILIZER SYSTEM 8 124 ...
Page 577: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Page 616: ...ELECTRICAL COMPONENTS 8 167 7 1 3 2 18 21 20 19 9 11 12 13 14 15 16 17 6 8 4 5 10 ...
Page 658: ......
Page 659: ......
Page 660: ......