3-5
RIG
GING
Rigging information
Uncrate procedure
1.
Check for any shipping damage.
2.
Remove the top cover.
3.
Remove all bolts from the bottom plate,
and remove the frame.
NOTICE:
Be
careful not to cause any damage to
the outboard motor.
4.
Remove the wrapping, and check the
outboard motor for concealed damage. If
any damage is found, use the concealed
crate damage claim procedure.
5.
Remove the top cowling and the flywheel
magnet cover
a
.
6.
Install a lifting harness
b
to the engine
hangers
c
.
7.
Tension the lifting harness.
8.
Remove the skeg holder
d
.
9.
Carefully lift up the outboard motor
together with the bottom frame
e
.
NOTICE:
Do not allow the lifting
harness to damage any parts of the
outboard motor.
10. Remove the bolts
f
.
a
b
c
c
d
e
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......