3-11
RIG
GING
Rigging information
5.
Adjust the cable joint
a
to the pin
c
of
the throttle cam.
WARNING! The
throttle cable joint must be screwed in
a minimum 8.0 mm (0.31 in).
6.
If the cable joint is not maintained the
engagement of minimum 8.0 mm
(0.31 in)
d
, remove the bolts
f
and
remount the holder with the holes
e
or
f
.
7.
Install the cable joint
a
to the pin
c
, and
secure it with the clip
g
.
TIP:
Pull the inner cable to avoid the free play
(backlash) of the cable, and install it to the
pin.
8.
Tighten the locknut
h
to the specified
torque.
9.
Check the throttle cable for proper
operation.
Installing the isolator lead (option)
Carry out the following procedures only when
the isolator lead (option) is used.
1.
Remove the cap
a
from the isolator cou-
pler.
2.
Connect the isolator lead
b
it’s coupler.
Installing the gauge harness
See “Rigging guide” for the installation of the
gauge to the boat.
1.
Remove the coupler
a
from the bracket
a
.
Dimension
d
: 8.0 mm (0.31 in)
c
a
a
d
f
e
f
Locknut
h
: 5 N·m (0.5 kgf·m, 3.7 ft·lb)
a
c
g
h
a
b
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......