9-48
PTT gear pump
0
1
2
3
4
5
6
7
8
9
10
A
2.
Check the down-relief valve
b
. Clean if
there is dirt or residue.
3.
Check the main valves
c
and shuttle
pistons
d
. Clean if there is dirt or
residue.
4.
Check the absorber valve pin
e
and up-
relief valve seat
f
. Clean if there is dirt
or residue.
5.
Check the valve pin
g
and valve seat
h
.
Clean if there is dirt or residue.
Assembling the gear pump assembly
•
Do not use a rag when assembling the
PTT unit because dust and particles on
the PTT unit components can lead to
poor performance.
•
Do not reuse the O-rings, always replace
them with new ones.
1.
Install a new O-ring
a
, the up-relief valve
seat
b
, ball
c
, absorber valve pin
d
,
and spring
e
.
2.
Install new O-rings
f
onto the main
valves
g
, and then install the main
valves.
3.
Install the gears
h
.
4.
Install the balls
i
, shuttle pistons
j
, and
balls
k
.
TIP:
Apply grease to the balls and shuttle pistons
to prevent them from falling out of the gear
pump cover.
a
d
c
d
e
f
b
g
h
c
a
a
b
b
c
c
d
d
e
e
f
f
f
g
g
g
h
h
k
k
k
j
j
j
j
i
i
i
i
k
j
i
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......