7-19
Power unit
POWR
TIP:
Leave the pin inserted into the hole
k
of the
timing belt tensioner until the timing belt is
installed again.
9.
Remove the timing belt from the driven
sprockets, and then from the drive
sprocket.
10. Install the new timing belt with its part
number in the upright position, from the
drive sprocket side to the port side driven
sprocket and the starboard driven
sprocket, in the counterclockwise
direction.
11. Turn the drive sprocket clockwise 2 full
turns, and then check that alignment
marks
c
and
d
,
g
and
h
are aligned.
12. Adjust the timing belt to the specified
installation height
m
.
13. Install the stator assembly (lighting coil)
b
and blowby hose
a
, and then connect
the pulser coil coupler
f
and stator
assembly coupler
e
. See exploded
diagram (7-5).
14. Install the Woodruff key and flywheel
magnet. See “Installing the flywheel
magnet” (7-6).
15. Install the flywheel magnet cover.
Timing belt installation height
m
:
2.0 mm (0.08 in)
c
d
g
h
m
e
f
a
b
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......