5-50
PTT system
0
1
2
3
4
5
6
7
8
9
10
A
7.
Connect the PTT relay coupler
e
and
PTT switch coupler
a
.
8.
Install the junction box cover.
Checking the trim sensor
1.
Remove the trim sensor, and then Dis-
connect the trim sensor coupler
a
.
2.
Measure the trim sensor resistance.
3.
Turn the trim sensor lever
a
from
b
to
c
and measure the resistance as it grad-
ually changes.
4.
Disconnect the gauge harness coupler
d
.
5.
Check the wiring harness for continuity.
6.
Install the trim sensor.
7.
Connect the gauge harness coupler
d
,
and trim sensor coupler
a
.
Wiring harness continuity:
a
Terminal 1–
e
Terminal 1
a
Terminal 2–
e
Terminal 2
a
Terminal 3–Terminal
c
f
e
a
a
Trim sensor resistance (reference data):
238.8–378.8
Ω
at
b
9.0–11.0
Ω
at
c
(setting resistance)
Wiring harness continuity:
a
Terminal 1–
d
Terminal 2
a
Terminal 2–Ground
a
b
c
d
d
a
Summary of Contents for F150B
Page 1: ...SERVICE MANUAL 6BM 28197 5L 11 F150B FL150B ...
Page 4: ......
Page 211: ...6 34 Vapor separator 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 311: ...8 32 Shimming regular rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T1 T2 ...
Page 351: ...8 72 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A Shim location F R P T3 T2 T4 T1 ...
Page 448: ...A 1 MEMO ...
Page 451: ......
Page 452: ...Printed in China Jul 2008 0 6 1 ABE E_4 YAMAHA MOTOR CO LTD ...
Page 458: ......