7-26
Rectifier Regulator and ignition coil
Installing the ignition coil
1.
Install the ignition coils “1”, and then
tighten the ignition coil bolts “2” to the
specified torque.
2.
Install the wiring harness “3” to the hold-
ers “4”, and then connect the ignition coil
couplers “a”.
3.
Install the spark plug wires “1”, “2”, “3”,
and “4”, and then fasten them using the
holders “5”, “6”, and “7”.
Installing the Rectifier Regulator
1.
Install a new gasket “1” and the Rectifier
Regulator “2”.
2.
Connect the Rectifier Regulator coupler
“a”, and then install the ground lead “1”.
Ignition coil bolt “2”:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
a
2
2
2
a
3
4
1
1
1
2
3
4
5
5
6
7
7
2
1
a
1
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...