7-9
Power unit assembly
0
1
2
3
4
5
6
7
8
9
10
A
16. Install the lifting harnesses to the engine
hangers “1”.
17. Suspend the power unit.
18. Remove the power unit mounting bolts
“2”, “3”, and “4”, and then remove the
power unit.
Installing the power unit
1.
Clean the power unit mating surface, and
then install the dowels “1” and a new gas-
ket “2”.
2.
Install the power unit, and then tighten
the power unit mounting bolts “3”, “4”,
and “5” to the specified torque.
3.
Install the apron “1”, and then tighten the
apron screw “2” to the specified torque.
4.
Connect the flushing hose “1”, and then
fasten it using the plastic tie “2”.
1
1
1
2
2
2
3
3
3
3
3
4
4
4
Power unit mounting bolt (M8) “3”:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
Power unit mounting bolts (M10) “4” and
“5”: 42 N·m (4.2 kgf·m, 31.0 ft·lb)
Apron screw “2”:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
3
3
3
4
4
4
4
4
5
2
1
5
5
1
2
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...