9-5
Shift rod and shift bracket
3.
Install a new O-ring “1” to the shift rod
assembly “2”.
4.
Install the grommet “3” to the upper case.
5.
Install the shift lever “4” to the set pin “a”
of the shift rod assembly “2”.
6.
Install the dowel “5” and shift rod assem-
bly “2”, and then align the center of the
set pin “a” with the mark “b” on the bot-
tom cowling.
7.
Install the washer “1” and shift bracket
assembly “2”, and then install the bush-
ing “3” and clip “4” to the shift lever “5”.
Shift rod detent bolt “6”:
18 N·m (1.8 kgf·m, 13.3 ft·lb)
1
3
4
5
6
2
2
4
2
a
a
b
5
1
3
5
2
3
4
1
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...