7-31
Wiring harness
0
1
2
3
4
5
6
7
8
9
10
A
12. Disconnect the air temperature sensor
coupler “c”, and then remove the YDIS
coupler “d”.
13. Remove the holder “5” and plastic ties “6”
and “7”.
Installing the wiring harness
See “Electrical component and wiring har-
ness routing” (5-1).
1.
Install the YDIS coupler “a”, and then
connect the air temperature sensor cou-
pler “b”.
2.
Install the PTT relay leads “1” and “2”,
ground lead “3”, and starter relay lead
“4”, and then tighten the PTT relay lead
nuts “5” and starter relay lead bolt “6” to
the specified torque.
3.
Connect the starter relay lead connector
“c” and PTT relay coupler “d”.
4.
Install the holder “7” to the junction box,
and then fasten the wiring harnesses
using the plastic ties “8” and “9”.
5.
Install the engine ECM “1”, and then con-
nect the engine ECM coupler “a”.
6.
Install the junction box “1” along with the
wiring harness.
a
b
d
c
1
2
7
3
4
5
6
PTT relay lead nut “5”:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
Starter relay lead bolt “6”:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
c
d
a
b
1
5
2
9
3
4
6
7
8
a
1
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...