3-13
Rigging grommet mounting
4.
Install the gauge harness coupler “a” to
the bracket “1”.
Installing the main wiring harness
1.
Route the main wiring harness “1”
through the bracket “2”.
2.
Connect the main wiring harness coupler
“a”, and then secure the main wiring har-
ness coupler “a” using the holder “1”.
Installing the rigging grommet
1.
Route each harness through the proper
hole in the rigging grommet. See “Rig-
ging grommet description” (3-9).
2.
Align the white tape “a” on the battery
cable “1” with the inner end of the rigging
grommet.
3.
Align the white mark “a” on the fuel hose
“1” with the outer end of the rigging grom-
met.
4.
Install the retaining plate “1”.
5.
Install the rubber seal “2”.
TIP:
Make sure that the rubber seal is installed
securely.
a
1
a
1
2
1
a
1
a
1
a
1
2
Summary of Contents for F150A
Page 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Page 4: ......
Page 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Page 110: ...3 41 Propeller selection MEMO ...
Page 129: ...4 18 Outboard motor troubleshooting MEMO ...
Page 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Page 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Page 475: ......
Page 476: ...Oct 2011 2 ABE E ...