PERIODIC MAINTENANCE
2-30
1
2
3
4
5
6
7
8
9
10
PERIOD
IC C
H
ECK
S
AN
D AD
JU
STMEN
T
S
POWER SUPPLY METER
1.
Check:
• Power supply display
a. Start the engine.
b. Connect any electric devices.
c. Turn on any electric devices and check that the
LED come on.
OPERATING TIME METER
1.
Check:
• Hour meter
TIP
The accumulated operation time is displayed by output
indicator lights “A” and “B”.
a. Start the engine.
b. Push the reset button 3 times within 1 second in
no-load running.
c. After one-second absence, the light “A” flashes
every 1000 hours, and the light “B” flashes every
100 hours. For example, if the light “A” flashes 2
times and the light “B” flashes 3 times, it shows
that the total operation time is approximately
2300 hours.
TIP
Hour meter does not function when the generators are in
parallel operation (Twin Tech).
OVERLOAD WARNING
The overload indicator light comes on when electricity over
the rated output is required by the connected electrical
devices, or when the inverter control unit overheats, or the
AC output voltage rises. Then the AC protector will trip,
stopping power generation in order to protect the genera-
tor and any connected electric devices.
When the overload indicator light comes on and power
generation stops, proceed as follows:
1.
Turn off any connected electric devices.
2
3
1
1. Output indicator light “A”
2. Output indicator light “B”
3. Reset button
1
2
1. Overload indicator light (Red)
2. Reset button
Summary of Contents for EF2200iS
Page 2: ...7PC F8197 E0_Hyoshi indd 3 4 2019 08 28 16 31 47 ...
Page 18: ...SPECIAL TOOLS AND TESTERS 1 8 1 2 3 4 5 6 7 8 9 10 GENERAL INFORMATION MEMO ...
Page 50: ...PERIODIC MAINTENANCE 2 32 1 2 3 4 5 6 7 8 9 10 PERIODIC CHECKS AND ADJUSTMENTS MEMO ...
Page 99: ...FUEL PUMP 4 7 1 2 3 4 5 6 7 8 9 10 CARBURETOR MEMO ...
Page 116: ...ELECTRICAL COMPONENTS 5 17 1 2 3 4 5 6 7 8 9 10 ELECTRICAL MEMO ...
Page 138: ...WIRE ROUTING DIAGRAM 7 16 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS ENGINE AND GENERATOR ...
Page 140: ...WIRE ROUTING DIAGRAM 7 18 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS UPPER SIDE AND LEFT SIDE VIEW ...
Page 142: ...WIRE ROUTING DIAGRAM 7 20 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS CONTROL UNIT ...
Page 144: ...WIRE ROUTING DIAGRAM 7 22 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS GENERATOR ...
Page 148: ...WIRE ROUTING DIAGRAM 7 26 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS CARBURETOR AND AIR FILTER ...
Page 150: ...WIRE ROUTING DIAGRAM 7 28 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS FUEL TANK AND FUEL HOSES ...
Page 152: ...WIRE ROUTING DIAGRAM 7 30 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS ...
Page 160: ...MEMO ...
Page 161: ...7PC F8197 E0_Hyoshi indd 3 4 2019 08 28 16 31 47 ...