QAY220 All Terrain Crane Operation Manual
1-2
1-3 Transport of hook block
T h e h o o k b l o c k s h o u l d n o t b e
suspended in front of the crane when the
crane travels on a highway, otherwise,
the field of vision of the driver may be
obstructed by the hook block, and driving
safety will be affected.
1. Transport of hook block for short
distance transfer
A hook block may be carried on board
when the crane is transferred for short distance
to another job site. The hook should be held
with an auxiliary cable and attached to the front
towing coupling.
2. Transport of hook block when the crane
is travelling on a highway
When the crane is travelling on a highway,
the hook block is not allowed on board, it
should be transported by another vehicle.
1-4 Crew
Only two persons are allowed in the
driver
’
s cab during travelling and no one is
permitted outside the cab.
1-5 Safety technical notes
1- Environment influence to cranes
1. Suitable working temperature for crane
operation is -20
℃
~+40
℃
. Beyond the range,
the working life of crane parts and operation
safety will be reduced. If the crane is to be
operated out of the temperature range, please
indicate the special application or auxiliary
parts, and grease needing to be added when you
order the machine.
2. The permissible maximum wind force
for crane operation is grade 5, i.e. wind velocity
is 14.1 m/s.
If ambient temperature is beyond the
normal working temperature, operator
has the right to stop operation on the
condition that there is no secondary
danger occurring.
General safe operating practices
Chapter 1
Summary of Contents for QAY220
Page 1: ...QAY220 All Terrain Crane Operation Manual Courtesy of CraneMarket com ...
Page 2: ...Courtesy of CraneMarket com ...
Page 4: ...Courtesy of CraneMarket com ...
Page 10: ...Courtesy of CraneMarket com ...
Page 36: ...QAY220 All Terrain Crane Operation Manual 1 24 Chapter 1 Courtesy of CraneMarket com ...
Page 43: ...QAY220 All Terrain Crane Operation Manual 2 7 Chapter 2 Courtesy of CraneMarket com ...
Page 44: ...QAY220 All Terrain Crane Operation Manual 2 8 Chapter 2 Courtesy of CraneMarket com ...
Page 53: ...QAY220 All Terrain Crane Operation Manual 3 9 Chapter 3 Courtesy of CraneMarket com ...
Page 54: ...QAY220 All Terrain Crane Operation Manual 3 10 Chapter 3 Courtesy of CraneMarket com ...
Page 78: ...QAY220 All Terrain Crane Operation Manual 4 24 Chapter 4 Courtesy of CraneMarket com ...
Page 107: ...QAY220 All Terrain Crane Operation Manual 5 29 Chapter 5 Courtesy of CraneMarket com ...
Page 108: ...QAY220 All Terrain Crane Operation Manual 5 30 Chapter 5 Courtesy of CraneMarket com ...
Page 116: ...QAY220 All Terrain Crane Operation Manual 6 8 Chapter 6 Courtesy of CraneMarket com ...
Page 126: ...QAY220 All Terrain Crane Operation Manual 7 10 Chapter 7 Courtesy of CraneMarket com ...
Page 134: ...QAY220 All Terrain Crane Operation Manual 8 8 Chapter 8 Courtesy of CraneMarket com ...
Page 149: ...QAY220 All Terrain Crane Operation Manual 9 15 Chapter 9 Courtesy of CraneMarket com ...
Page 150: ...QAY220 All Terrain Crane Operation Manual 9 16 Chapter 9 Courtesy of CraneMarket com ...
Page 160: ...QAY220 All Terrain Crane Operation Manual 10 10 Chapter 10 Courtesy of CraneMarket com ...
Page 164: ...QAY220 All Terrain Crane Operation Manual 11 4 Chapter 11 Courtesy of CraneMarket com ...
Page 169: ...QAY220 All Terrain Crane Operation Manual 12 5 Chapter 12 Courtesy of CraneMarket com ...
Page 170: ...QAY220 All Terrain Crane Operation Manual 12 6 Chapter 12 Courtesy of CraneMarket com ...
Page 171: ...Courtesy of CraneMarket com ...
Page 172: ...Powered by TCPDF www tcpdf org Courtesy of CraneMarket com ...