![Woodward SPM-D11 Manual Download Page 56](http://html1.mh-extra.com/html/woodward/spm-d11/spm-d11_manual_995747056.webp)
Manual 37259C
SPM-D11 - Synchronizing Unit
Page 56/79
© Woodward
Load/Var Sharing
Active power
Load-share ON
Load sharing
ON/OFF
ON
................Real power is distributed among the generators operating in parallel.
The generator outputs are distributed depending on the set values.
The following screens of this function are displayed
OFF
..............There is no load sharing control performed, and the following
screens of this function are not displayed.
Act. load share
Factor =00%
Load sharing reference variable
10 to 99 %
The higher the weighing factor is configured, the more influence the main control
variable (frequency) has on the control. The lower the weighing factor is config-
ured, the greater the influence of the secondary control variable (generator real
power).
Reactive power
Load-share ON
var sharing
ON/OFF
ON
................Re-active power is distributed among the several generators operat-
ing in parallel. The generator outputs are distributed depending on
the set values. The following screens of this function are displayed:
OFF
..............There is no var sharing control performed, and the following screens
of this function are not displayed
.
React.load share
Factor =00%
var sharing reference variable
10 to 99 %
The higher the weighing factor is configured, the more influence the main control
variable (voltage) has on the control. The lower the weighing factor is configured,
the greater the influence of the secondary control variable (generator reactive
power).