Mains/Busbar
GCB
Synchronizing
voltage
G
L2
L1
23
24
1
2
3
N
L1
L2
L3
2
3
1
MCB
Figure 3-6: Measuring inputs - Synchronization voltage
Note:
Connection corresponding to the Bus configuration (see wiring diagram).
Terminal Measurement
Description
A
max
Connection of the measuring circuit voltage corresponding to variant
c
,
d
or
e
23
Synchronization ref. voltage L1
2.5 mm²
24
direct
or ../100 V
Synchronization ref. voltage L2
2.5 mm²
Current
WARNING
Before disconnecting the secondary terminals of the current transformer or the connections of the cur-
rent transformer at the unit, ensure that the transformer is short-circuited.
NOTE
Current transducers are generally to be grounded on one side of the secondary.
N
L2
L3
L1
Generator current
../1 A or ../5 A
MCB
26
25
s1 (k)
s2 (l)
L1
GCB
G
S2
S1
s2
s1
Figure 3-7: Measuring inputs - Current
Terminal Measurement
Description
A
max
25
Generator current L1, transformer terminal s2 (l)
2.5 mm²
26
Transformer
../1 A o. ../5 A Generator current L1, transformer terminal s1 (k)
2.5 mm²
NOTE
If the generator load is always symmetrically, the current may also be measured in L2 or L3. This must
be considered when configuring the SPM-D11 (refer to CTs (Current Transformer) on page 42). If there
is a possibility that the load may be asymmetrical, the current must be measured in L1.