Setup & Operation
Preparing The Sawmill For Towing
2
2-35
HDdoc012020
Setup & Operation
13.
Place both fenders in the slots located behind the trailer tires and secure with retaining pins. Raise all but the
very front outrigger.
See the trailer operator’s manual for specific information regarding hitch operation and towing the sawmill.