3064816_201804
77
36. Technical information, balanced flue
Connection to moisture-resistant flue gas system and balanced flue chimney
Plewa System
C43x
Schiedel System
C43x
10
10
10
10
1 Gas condensing boiler
2 Balanced flue with
inspection port
(250 mm long)
4 Balanced flue
DN 60/100
500 mm
1000 mm
2000 mm
9 Inspection bend
10 Bend 87° DN 60/100
11 Pipe collar
12 Support rail
13 Support bend 87°
DN 60 to DN 80
14 Spacer
15 PP flue DN 80
500 mm
1000 mm
2000 mm
16 Duct cover
with UV-resistant ter-
minal
17 Spacer clip
18 Balanced flue
horizontal, with wind
protector
19 Connection to flue gas
chimney B33
Length 250 mm with air
apertures
17
18
18
11
11
11
11
19
4
160
160
>400
2
10
4
4
17
17
9
9
12
13
14
16
15
1
1
1
Horizontal balanced flue/connection to balanced flue chimney (examples) system DN 60/100
C13x
C13x
B33
Dormer