Vertical balanced flue routing (examples) system DN 60/100
Flue gas < 120 °C
C93x
6
7
Install horizon-
tal pipe with >
3° fall towards
boiler
Please
note
1 Gas condensing boiler
2 Balanced flue with
inspection port
(250 mm long)
3 Separator DN 60/100
(sliding socket)
if required
4 Balanced flue DN 60/100
500 mm
1000 mm
2000 mm
5 Balanced flue, vertical
DN 60/100
(roof outlet for flat
or pitched roofs)
L = 1200 mm
L = 1200 mm ... 1700 mm
6 Universal tile for
pitched roof 25/45°
7 Flat roof collar
8 Bend 45° DN 60/100
9 Inspection bend DN 60/100
10 Bend 87° DN 60/100
11 Pipe collar
12 Support rail
13 Support bend 87° DN 60 to DN 80
14 Spacer
15 Flue DN 80
500 mm
1000 mm
2000 mm
16 Duct cover
with
UV-resistant terminal
17 Spacer clip
Installation examples for room sealed con
-
nections (vertical)
C33x
C33x
C33x