64
RT System 2 v2.3 Deployment Guide
R01.i
© 2010-2014 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
Ɣ
Attach the radio cables to the LIU.
Ɣ
Attach the antenna to LIU.
Ɣ
Attach the battery to the LIU.
Table 3–10 How to Set Up the Backhaul
Step
Image