
R01.i
RT System 2 v2.3 Deployment Guide
55
© 2010-2014 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
Ɣ
Rocket radio installation – While the mast is
resting on the ground, slide the following on
the mast:
Ź
Mast guy ring [M-4]
Ź
Surge Protector cable clamp (do not
tighten)
Table 3–10 How to Set Up the Backhaul
Step
Image