
54
RT System 2 v2.3 Deployment Guide
R01.i
© 2010-2014 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul
9
Assemble the mast:
Ɣ
Bullet radio installation – While the mast is
resting on the ground, slide the following on
the mast:
Ź
Bullet radios and clamps (do not tighten)
Ź
Mast guy ring [M-4]
Table 3–10 How to Set Up the Backhaul
Step
Image