Connect the DC battery power to the +VIN (red or white) and COM (black) connections on
terminal block TB4 on the lower left side of the base board. The source must be capable of
delivering the maximum current as defined in the Technical Data table.
Note: The mast, RCP, and control box assemblies must be installed and wired prior to power-up.
Failure to do so will result in errors and could damage the unit.
5.10.4
Wiring Source Power to the Lighting Circuits
The lighting circuits consist of two (2) independently powered circuits: left and right. Depending
on the light package installed on the unit, the source power for the left and right light circuits will
change to match the light fixtures. Be sure to confirm the installed light fixture voltage
requirements before applying light power to avoid damaging equipment.
It is important to calculate the current draw for the wires in each lighting circuit. To calculate the
current draw for the wires:
• Divide the total watts of the entire mast unit by two (since there are two circuits).
• Divide the result by the voltage.
• This final result is the amperage required for each side light circuit.
Table 5-4 shows some example current calculations. Your mast may have different results based
on the installed light type and number of lights. In Example 1 (Table 5-4), the lights in the system
are a total of 500 watts. This is divided by two to get the watts per side. The result is then divided
by the voltage (12) to get the amps (21 rounded). The wires in this example should be able to
carry at least 21 amps with minimal voltage drop.
It is the responsibility of the installer to provide over-current protection for both lighting circuits.
The over-current protection on each circuit should be sized for the calculated current draw for the
installed lights (and not based on wire size current capacity). It is also the responsibility of the
installer to provide a means to remove/isolate power from the mast light circuits and permit the
operator to follow proper lock-out tag-out procedures for maintenance or troubleshooting.
Light power cables can be purchased from The Will-Burt Company or provided by the installer.
For CE conformity, the installer must provide the light power cables in conformance with
applicable Directives. Cables supplied by The Will-Burt Company do not have blue color for
conductor identification.
If the cables are supplied by the installer, the cables must:
• Be type SOOW or equivalent.
Table 5-4 Sample Light Circuit Current Draw Calculation
Total Watts
Voltage
Current Draw Per Side (Amps)
Example 1
500 W
12 VDC
21 Amps per side
Example 2
1500 W
120 VAC
6.25 Amps per side
Summary of Contents for NIGHT SCAN VERTICAL
Page 2: ......
Page 6: ...PAGE 4 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 14: ...PAGE 12 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 16: ...PAGE 14 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 26: ...PAGE 24 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 52: ...PAGE 50 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 58: ...PAGE 56 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 73: ...PAGE 71 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 74: ...PAGE 72 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 75: ...PAGE 73 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 76: ...PAGE 74 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 77: ...PAGE 75 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 78: ...PAGE 76 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 80: ...PAGE 78 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 81: ...PAGE 79 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 82: ...PAGE 80 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 94: ...PAGE 92 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 98: ...PAGE 96 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 100: ...PAGE 98 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...