PAGE 43 OF 98
NIGHT SCAN VERTICAL
OPERATING INSTRUCTIONS
TP-4836201-G
MARCH 2021
The HHRC comes with a holder (see Figure 5-16) to hang the HHRC. Attach the HHRC holder at
a convenient location to hang the HHRC in a dry, protected environment. To install the holder:
1. Drill two holes 1.125 inches (28.6 mm) apart as appropriate for the screws and mounting
method (nut/bolt or sheet metal screw or other) selected.
2. The mounting screws are provided by the installer based on the method of attaching
selected. The recommended screw size is M4 flat head to sit flush with the surface after
installation. Use the proper installation torque for the screw selected and use thread-locking
techniques to prevent the screws from backing out due to vibration. Mount the holder to
ensure the wedged side in the groove is facing upward to mate to the HHRC.
3. Place the HHRC on the holder.
Warning labels are shipped loose with the mast. These labels should be posted in view of the
operator.
Figure 5-16 HHRC Holder
5.9.2
Panel Mount Remote Control (PMRC)
If your system was not ordered with the optional PMRC, go to section 5.10.1.
The PMRC should be located where the operator has line-of-sight to the mast operating space.
The PMRC should be located in a protected, dry location (the PMRC is IP54). To attach the
PMRC:
1. Cut the panel according to the dimensions shown in Figure 5-17.
2. The screws are provided by the installer. #10 stainless steel screws are recommended with
an installation torque of 20-24 in.-lb. (2.2-2.7 Nm).
3. Place the PMRC through the panel cutout and secure with screws.
Lines show inside
ridge
Summary of Contents for NIGHT SCAN VERTICAL
Page 2: ......
Page 6: ...PAGE 4 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 14: ...PAGE 12 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 16: ...PAGE 14 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 26: ...PAGE 24 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 52: ...PAGE 50 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 58: ...PAGE 56 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 73: ...PAGE 71 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 74: ...PAGE 72 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 75: ...PAGE 73 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 76: ...PAGE 74 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 77: ...PAGE 75 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 78: ...PAGE 76 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 80: ...PAGE 78 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 81: ...PAGE 79 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 82: ...PAGE 80 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 94: ...PAGE 92 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 98: ...PAGE 96 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 100: ...PAGE 98 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...