PAGE 29 OF 98
NIGHT SCAN VERTICAL
OPERATING INSTRUCTIONS
TP-4836201-G
MARCH 2021
4. Place the gasket on the roof and align the mounting holes.
5. Install the V-Seal over the mast base tube and slide the seal towards the top of the mast.
Soapy water can be used to assist in sliding the seal.
6. Use a properly rated hoist to lift the mast above the roof. Use the lifting points shown in
Figure 5-1. Lower the mast through the gasket and roof opening. Once the mast is through
the access hole, it is recommended to install the base plate while the mast is still supported
by the lifting device (see section 5.4.2). Once the base plate is installed, lower the mast into
its final position and loosely install the base plate mounting bolts to locate the base of the
mast and fix the mast orientation.
7. Lift up the gasket and apply silicone sealant to both sides. Place the gasket into position with
the mounting holes aligned. Place the bracket halves and wear ring into position and apply
silicone sealant where the bracket halves come together. The wear band should rest in the
groove of the bracket halves.
8. Tighten the two M5 bracket screws to fix the bracket halves together. Torque the bracket
screws to 4-5 Nm (35-45 in.-lb.). It is recommended to apply a low strength thread-locking
compound.
Figure 5-3 Internal Mounting Kit Assembly Detail
9. Loosely install six user provided 1/4 inch or M6 bolts, lock washers and hex nuts to secure
the internal mounting kit bracket to the roof. Bolt length depends on the specific application
and is to be determined by the installer. Once all bolts are loosely in place, check alignment
of the mast base plate to the mounting surface. If properly aligned, tighten the base plate
mounting hardware according to section 5.4.3. Once the base plate is tightly fixed, tighten the
internal mounting kit bolts. The recommended installation torque for an M6 or 1/4 inch
stainless steel fastener is 7-8 Nm (60-72 in.-lb.). Note: This torque assumes the roof structure
is firm. It is recommended to use a low strength thread-locking compound.
V-Seal
Wear Band
Gasket
Bracket Half
Bracket Screw
Vehicle Roof
Summary of Contents for NIGHT SCAN VERTICAL
Page 2: ......
Page 6: ...PAGE 4 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 14: ...PAGE 12 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 16: ...PAGE 14 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 26: ...PAGE 24 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 52: ...PAGE 50 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 58: ...PAGE 56 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 73: ...PAGE 71 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 74: ...PAGE 72 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 75: ...PAGE 73 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 76: ...PAGE 74 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 77: ...PAGE 75 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 78: ...PAGE 76 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 80: ...PAGE 78 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 81: ...PAGE 79 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 82: ...PAGE 80 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 94: ...PAGE 92 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 98: ...PAGE 96 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 100: ...PAGE 98 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...