PAGE 23 OF 98
NIGHT SCAN VERTICAL
OPERATING INSTRUCTIONS
TP-4836201-G
MARCH 2021
4 Technical Data
Night Scan Vertical
4.3-15
5.4-17
6-20
7-25
8-30
Extended Height (ft / m)
13.4 / 4.08
17 / 5.2
20.4 / 6.2
25.4 / 7.7 30.4 / 9.2
Nested Height (ft / m)
4.5 / 1.3
5.5 / 1.68
6.1 / 1.9
7.1 / 2.2
8.1 / 2.5
Mast Control System Input Voltage
12VDC - 24VDC
Mast Control System Current
14A Max at 12VDC 10A Max at 24VDC
Lighting Input Voltage (for DC lights)
12VDC - 24VDC
Lighting Current (for DC lights)
50A Max at 12VDC 25A Max at 24 VDC
Lighting Input Voltage (for AC lights)
110VAC - 220VAC (50 or 60 Hz)
Lighting Current (for AC lights)
38A Max at 110VAC 28A Max at 220VAC
System Operating Temperature
-22 to 149 °F / -30 to 65 °C
System Storage Temperature
-40 to 149 °F / -40 to 65 °C
Deployment Angle
±5° Maximum
Deployment Wind Speed (mph / km/
40 max / 64 max
Altitude Above Sea Level (ft / m)
15,000 / 4572 Maximum
*Survival Wind Speed (mph / km/h)
119-140+ /
191-225+
100-121 /
160-195
87-104 /
140-167
73-86 /
117-138
63-73 /
101-117
Auto Stow
®
Yes
Number of Lights Available
4 or 6
Light Type Available
LED or Halogen
Maximum Lumens
220,000
220,000
220,000
220,000
220,000
Full Pan and Tilt Light Positioning
Yes
Opposable Light Fixtures
Yes
Profiler - Space Saving Fixture Option
Yes
Strobe Light Option Available
Yes
D-TEC Powerline Detection System
Option
Yes
Camera Option Available
Yes
**Airborn Noise Emissions
equivalent A-weighted sound pressure level at the operating
position is less than 70 dB(A)
*Varies depending on light package - NFPA 125% Safety Factor
**Measured according to EN ISO 3744:2010
Summary of Contents for NIGHT SCAN VERTICAL
Page 2: ......
Page 6: ...PAGE 4 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 14: ...PAGE 12 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 16: ...PAGE 14 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 26: ...PAGE 24 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 52: ...PAGE 50 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 58: ...PAGE 56 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 73: ...PAGE 71 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 74: ...PAGE 72 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 75: ...PAGE 73 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 76: ...PAGE 74 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 77: ...PAGE 75 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 78: ...PAGE 76 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 80: ...PAGE 78 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 81: ...PAGE 79 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 82: ...PAGE 80 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 94: ...PAGE 92 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 98: ...PAGE 96 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Page 100: ...PAGE 98 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...