2. Mount the device onto the tilt tensioner of the wall board.
a. Attach the bottom of the device bracket onto the tilt tensioner so that the device hooks
into place as shown in the illustration.
b. Attach the top of the device bracket onto the tilt tensioner so that the device hooks into
place as shown in the illustration. Apply some pressure to the top of the device and push
down until the device slides down into the hook of the top tilt tensioner.
c. Tighten the screw to secure the device bracket to the tilt tensioner.
Exploded view diagram
The drawing below shows individual components of the device and their relationships to one
another.
40 Disassembly and repair
Summary of Contents for Spot Vital Signs 4400
Page 1: ...Welch Allyn Spot Vital Signs 4400 Service manual Software version 1 X...
Page 8: ...4 Symbols and definitions...
Page 34: ...30 Power up sequence...
Page 68: ...64 Field replaceable units...
Page 127: ...Interconnect diagram Service manual Appendix 123...
Page 128: ...124 Appendix...
Page 132: ......