58 Pneumocheck Handle and Printer/Charger
Service Manual 610132 Rev. E
The RED wire of the connector to the rotary
board (part of the TOP PANEL ASSEMBLY)
should be to the RIGHT.
Torque (items 18 and 19) to 3 - 4 in. lbs.
Torque (item 2) to 2.7 - 3 - 4 in. lbs.
B.
Removing the CONTROL P. C. BOARD
ASSEMBLY (item 10)
1.
Remove the TOP PANEL ASSEMBLY
(item 1) as instructed in Part A.
2.
Remove the three screws (item 26) that
hold the CONTROL P .C. BOARD
ASSEMBLY.
3.
Remove the CONTROL P.C. BOARD
ASSEMBLY.
Reassembly is the reverse of disassembly.
NOTE:
Torque (item 26) to 1.0 - 1.5 in. lbs.
C.
Removing the SPRING CONTACTS (item 13)
1.
Remove the TOP PANEL ASSEMBLY
(item 1) as instructed in Part A.
2.
Remove the screws (items 12) securing
the SPRING CONTACTS to the MAIN
P.C. BOARD ASSEMBLY (item 14).
3.
Remove the SPRING CONTACTS.
Reassembly is the reverse of disassembly.
Torque item 12 to 1.5 - 2.0 in.lbs.
Section 5 - Disassembly and Repair
Summary of Contents for PneumoCheck 61000
Page 3: ...2 Pneumocheck Handle and Printer Charger Service Manual 610132 Rev E ...
Page 39: ...38 Pneumocheck Handle and Printer Charger Service Manual 610132 Rev E ...
Page 65: ...64 Pneumocheck Handle and Printer Charger Service Manual 610132 Rev E ...
Page 69: ...68 Pneumocheck Handle and Printer Charger Service Manual 610132 Rev E ...
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......