46
Calibration (LMLS-500 Only)
4. With the electric lights ON, use a light meter to
measure the light level in each zone.
5. Enter the measured light level at the task surface
per zone, in the LMCT-100.
6. Daylighting controlled loads will turn OFF.
7 Use a light meter to measure the light level in
each zone.
8. Enter the measured light level at the task surface
per zone in the LMCT-100.
9. Select the Send button to establish
communication with the LMLS-500.
Press
Select
L M L S - 5 0 0 0 2 9 3 7 2 4 9 0 9
Z o n e S e t u p
C a l i b r a t i o n
Z o n e S e t t i n g s
A d v a n c e d S e t t i n g s
C o n t r o l M o d e
Choose
Calibration
L i g h t s w i l l w a r m u p
a n d r e m a i n O N f o r
t w o m i n u t e s
P l e a s e w a i t 1 2 0 s e c .
Counts down from120 seconds
then returns to the Main Menu
Enter light level for
ALL zones
C a l i b r a t i n g L M L S - 5 0 0
P o i n t t o A n y I R
e n a b l e d d e v i c e o n
t h e n e t w o r k
P r e s s ‘ S e l e c t ’
Point and
Press Select
Ta k e a l i g h t l e v e l
a t Z o n e 1
Z o n e 1 : 5 0 f c
N E X T
C a l i b r a t i n g L M L S - 5 0 0
( F u l l O n )
C a l i b r a t i n g L M L S - 5 0 0
( F u l l O n )
Ta k e a l i g h t l e v e l
a t Z o n e 1
Z o n e 3 : 5 0 f c
N E X T
Press
Select
Choose
NEXT