Cotter Corporation (N.S.L.)
Cañon City Milling Facility
Cañon City, Colorado
Procedure
Soil Sampling
Number:
SOP-E-
110
Page 5 of 8
Revision: 1
Date: --/--/--
8.12.2.
Place the collected soil in to a stainless steel bowl and mix to blend the
sample.
8.12.3.
Place the blended soil in to two sample bags. Label one as the regular
sample and the other as the QA duplicate sample.
8.13.
After arriving back at the facility, complete the required paperwork and SSTF
form. Transfer sample custody to the laboratory for processing and analysis as per
SOP-E-160.
9.0
RECORDS
9.1.
Field sampling logbook, field data sheet, or tablet
Summary of Contents for sympHony
Page 12: ...VWR sympHony Meter User Guide Exhibit 5 2...
Page 69: ...254503 001 Rev B...