10
A separate dry boiler room must be provided for the
system. No combustible materials may be stored in the
boiler room.
Boiler room requirements:
■
No air contamination by halogenated hydrocarbons
(e.g. contained in sprays, paints, solvents and clean-
ing agents)
■
Dry
■
High humidity levels to be avoided (e.g. caused by
continuous drying of washing)
■
Prevent very dusty conditions
■
Max. ambient temperature 35 °C
■
Prevent frost and ensure good ventilation
■
Reliable and adequate supply of fresh air
Danger
Partial combustion due to combustion air defi-
ciency can lead to life threatening poisoning
from carbon monoxide.
■
Ensure an adequate supply of fresh air.
■
Never cover or close vents.
Danger
Easily flammable liquids and materials,e.g.
naphtha/petrol, solvents, cleaning agents, paints
or paper, can cause deflagration and fire.
Do not store easily flammable materials in the
boiler installation room.
Boiler room floor requirements
The boiler must be positioned on a non-combustible,
temperature-resistant substrate.
Requirements regarding the load bearing capacity of
the boiler room floor.
See the technical guide for the boiler
Handling
Danger
Risk of injury due to the boiler tilting or falling
■
Lift at the transport lug using flexible sling gear
or shackles.
■
Transport with pallet truck / forklift truck.
!
Please note
Severe jolts can damage the combustion cham-
ber.
Do not subject the boiler to any severe jolts dur-
ing handling and positioning.
Note
■
The boiler weighs approx. 900 kg.
■
At least 2 people are needed to transport the boiler
to the installation location.
■
Transport the boiler to the installation location in an
upright position and, if possible, on the pallet.
Max. tilting angle during handling
To avoid material damage and injury, the following tilt-
ing angles must not be exceeded during transport.
Boiler side Tilting angle
With transport pal-
let
Without transport
pallet
■
Front
25°
21°
■
Back
24°
25°
■
Left
25°
29°
■
Right
29°
29°
Preparing for installation
Boiler room requirements
5679249
Installation