14
yes
Automatic calibra-
tion of the com-
bustion controller
no
Fault E3
Ensure adequate
heat transfer.
Press reset button
R
.
Fault Eb
Check gap
between ionisation
electrode and
burner gauze
assembly.
Check allocation of
gas type (coding
address 82, gas
train setting).
Check flue system;
remedy flue gas
recirculation if
required.
Press reset button
R
.
For further details on faults, see
page 95.
Checking the static and supply pressure
Danger
CO build-up as a result of an incorrect burner adjustment can have serious
health implications.
Carry out a CO test before and after work on gas equipment.
Operation with LPG
Flush the LPG tank twice during commissioning/replacement. Vent the tank and gas
supply line thoroughly after flushing.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 860 GB
Summary of Contents for CU3A
Page 147: ...147 5692 860 GB ...