9
5.
Mark the set pressure at pressure
gauge
A
.
6.
Record the fill volume, water hard-
ness and pH value on page 27.
Note
Observe the "Water quality require-
ments" on page 139.
7.
Return the check valves to their oper-
ating position.
Filling siphon with water
1.
Undo fitting
A
of siphon
B
, remove
the siphon and fill it with water.
Note
There is a risk of flue gas escaping if
the siphon is not filled with water.
2.
Refit siphon
B
.
Changing the language (if required)
Note
At the commissioning stage, the display
is in German (default setting)
Extended menu:
1.
å
2. "Settings"
3. "Language"
Sprache
Cesky
CZ
Deutsch
DE
Dansk
English
DK
GB
Wählen mit
Ø
ç
4.
Set the required language with
/
.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)