Checking the water quality
Enter the amount of top-up water and the
total hardness of the feed and boiler
water into the following table.
For water quality requirements, see
page 139.
Meter read-
ing
Fill and top-
up water
Total water
volume
Total hardness
pH value Date
Feedwater Boiler water
m
3
m
3
m
3
°mmol/l
°mmol/l
The total hardness of the feed and top-up water must not exceed the guidelines
specified by the VDI 2035 (see page 139).
The pH value should be between 8.2 and 10.0.
Checking the mixer for obstructions and leaks
1.
Remove the motorised lever from the
mixer handle.
2.
Check the mixer for ease of opera-
tion.
3.
Check the mixer for leaks. Replace
the O-rings if the mixer leaks.
4.
Snap the motorised lever into place.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 860 GB