21
Minimum clearances
Secondary circuit connections to the left
1000
250
Fig. 14
Secondary circuit connections to the right
1000
250
Fig. 15
Secondary circuit connections at the top
1000
Fig. 16
Installation sequence
Installing the indoor unit
(cont.)
51
17 700 GB
Installation