29
7.
Boiler operation by user
Before putting the boiler into operation or in case that the fuel feeder is empty during operation and it is
necessary to fill the fuel feeder with pellets:
•
pull out the plug 230 V from the socket of burner;
•
insert the plug of power supply (230 V/50 Hz);
•
wait until the wooden pellets start to discharge from the throat of the fuel feeder;
•
pull out the plug from the power supply and insert it back into the socket of burner.
7.1
Version VIADRUS HERCULES Green Eco Therm XJ
Home screen
S
button to enter a submenu or to confirm the setting
+ And - buttons for movement in menu and modifying of values
ESC key for return to the higher level of menu or return to the main menu
S
-
+
ESC
S
-
+
ESC
For putting the burner into operation press the button "S"
•
Activate? (activate)
putting the burner into operation
After putting the burner into operation the following message appears on the display:
S
-
+
ESC
The display shows information about the current operating mode of the burner:
•
TEST - BLOWING (blowing through the burner) the burner performs the initial blowing through with
the purpose to remove all debris from the grate of burner;
•
32°
actual water temperature in the boiler. The water temperature in the boiler is displayed in
case the burner is started in the mode of sensing the water temperature by means of a sensor;
•
FC: 0%
intensity of flame, measured by means of a photosensor (%)
Activate?
ENTER
GREEN ecoTHERM
v2s 1
Software version number
of control module of
burner
TEST – BLOWING
ON 32
o
FC: 0%