background image

19BAI-1

19HE SERIES BOILER

BOILER SECTION ASSEMBLY INSTRUCTIONS

When boilers are delivered to the job site, each item
should be inspected closely for possible shipping 
damage. Scars or nicks in the port sealing surfaces
may allow leakage. Do not attempt to use any section
that has been damaged in the port seal area.  Clean
hydronic gasket (port) recesses and rope groove with a
wire brush, taking care not to damage machine surface.

When ready to commence assembly, on a level pad,
place the angle rails in position parallel with each other
with the 2-1/2 inch side on the floor and measuring 
25-21/32 inches apart (outside dimension). Be sure to
align the center of the boiler with the centerline of the
pad. If no pad is provided, shim and grout under the
angles to make them level and provide support along
the full length.

Proper location of sections.

3 SECT F

H B

4 SECT F

P H B

5 SECT F

H P H B

6 SECT F

P H P H B

7  SECT F

H P H

P H B

8  SECT F

P H P H P H B

9  SECT F

P H P H P H P

B

10 SECT F

P

P H P H P H

P B

11  SECT F

P

P

P H P H P

H P

B

12  SECT F

P

P

P P H P H

P H P

B  

F = Front Section
P = Plain intermediate section
H = Heater intermediate section 

-(Optional, must be ordered). 

B = Back Section

WESTCAST, INC.
260 NORTH ELM STREET  WESTFIELD, MA  01085
TEL. (413) 562-9631   FAX: (413) 562-3799
www.smithboiler.com

NOTE: Some sections may need shims under 
support feet to align with other sections.

Stand the back section in place with the feet on and in
the angle iron rails. Support the section as required to
prevent it from falling. Clean hydronic gasket (port)
recesses and rope groove with a stiff wire brush. Apply
spray-on adhesive (supplied with the boiler) to rope
groove to hold wicking in place during assembly.

NOTE: Do not spray adhesive in the hydronic seal
ports.

Apply a length of wicking avoiding bends and twists.
Make sure ends extend past the cleanout cover open-
ing. Place the upper and lower hydronic seals in the
recessed (port) section taking care not to dislodge the
rope or the hydronic seals. Inspect the alignment of the
sections through the open ports and, if properly aligned,
install the draw rods with nuts drawn hand-tight. (See
FIGURE 1.) Plumb the sections before applying torque
to the upper right and lower left draw rods. Maintain fin-
ger-tight torque on upper left and lower right draw rods.

Reviews: