14
Boiler positioning with regard to electricity network:
•
the boiler must be placed so that the plug in socket (230 V/50 Hz) is always accessible;
•
the boiler is connected to the mains by a fixed movable inlet with a normalized plug;
•
the electric shock prevention must be guaranteed according to valid EN (see chap. 4.1.)
A permanent air supply for combustion and ventilation must be guaranteed in the room where
the boiler is installed (the air consumption of VIADRUS HERCULES Green Eco Therm 5X boiler
amounts to approx. 80 m
3
.h
-1
, the air consumption of VIADRUS HERCULES Green Eco Therm 7X
boiler amounts to approx. 160 m
3
.h
-1
.
The connection of heating system piping must be carried out by a person authorised according to
the valid regulations.
.
CAUTION:
When connecting the boiler to the heating system there must be installed a inlet and
outlet cocpcs in the lowest point and as near as possible to the boiler (at the return
water flange).
5.
Order, delivery and assembly
5.1
Order
In the order the following is needed to be specified:
1.
Output and type of burner (see chap. 1)
2.
Requirements for accessories offered on request
5.2
Delivery and accessories
Boiler VIADRUS HERCULES Green Eco Therm is supplied so that on a pallet there is placed the complete
boiler drum and on the side there is attached the wrapped boiler shell. The accessories are stored inside the
boiler drum and are accessible after opening the cleaning door. On the other pallet there is stored wooden
fuel container, in which there is stored the burner, the fuel feeder and their accessories. The boiler is packed
into a shipping container and must not be flipped during shipping; it is only permitted to tilt to the sides in
order to remove the wrapping from the boiler drum.
Standard accessories to boiler:
•
Boiler with the appropriate number of boiler sections on the palette
•
Flange of heating water G 1 1/2"
1 pc
•
Return water flange G 1 1/2 "with socket Js 1/2" for the fill and drain cock
1 pc
•
Sealing
φ
90 x 60 x 3
2 pcs
•
Washer 10,5
8 pcs
•
Nut M10
8 pcs
•
The fill and drain cock Js 1/2“
1 pc
•
Three-position sump of thermostat G 1/2"
1 pc
•
spring of the capillary
1 pc
•
Blind plug Js 6/4“
1 pc
•
Sealing 60 x 48 x 2
1 pc
•
The boiler shell including the ashtray and insulation in the adequate size
•
Fasteners for jacketing
-
console 1 assembly
2 pcs
-
console 2 assembly
2 pcs
-
washer 10,5
4 pcs
-
nut M10
4 pcs
-
connecting pin
4 pcs
-
screw M5 x 12
4 pcs
-
washer 5,3
4 pcs
-
screw into the plate ST 4,2 x 9,5
6 pcs
-
spring clamp
4 pcs
-
bushing PG 9
7 pcs
•
control box
1 pc
-
screw M5 x 12
4 pcs
-
serrated washer 5,3
4 pcs
•
cleaning equipment
-
hook
1 pc
-
brush with handle
1 pc