Appendix E - Startup and Commissioning Checklist
_______________________________________________________________________________________________________________
MNL000542
Revision 1
03/26/2018
BSGS eV / BULKGUARD eV
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page APP
E
-
12
Digital Outputs Dry -
Customer I/O board AP1563 (
24 VDC @ 1 Amp maximum)
Relay Output #
NO
Customer Brd
COMMON
NC
1
T4-1
T4-2
T4-3
2
T4-4
T4-5
T4-6
3
T4-7
T4-8
T4-9
4
T4-10
T4-11
T4-12
5
T5-1
T5-2
T5-3
6
T5-4
T5-5
T5-6
7
T5-7
T5-8
T5-9
8
T5-10
T5-11
T5-12
9
T6-1
T6-2
T6-3
10
Factory use only
Factory use only
Factory use only
11
Factory use only
Factory use only
Factory use only
12
T6-10
T6-11
T6-12
TT.
If Supervisory Circuits shall be utilized, verify the proper alarm numbers are being used and the wiring is
terminated in the proper terminal blocks. Verify functionality of the supervisory circuits with the Customer.
UU.
Verify the
GASGUARD
®
Monitoring Network wiring is installed and terminated on both ends. Verify
site network matrix is updated with this BSGeV equipment.
VV.
Verify the BSGeV is configured on the host network computer system. Ensure that the network
communications mode is set to Ethernet and appropriate channel numbers and IP address are set.
WW.
Verify AP controller Screen Saver Delay is set to 35 minutes.
XX.
Verify AP controller Key Press Feedback is set to Enabled.
YY.
Verify the site network matrix is updated with this BSGeV equipment.
ZZ.
Verify Password Protected Reset is Enabled or Disabled, per Customer’s site requirements.
AAA.
Verify Site Passwords are loaded into AP controller.