Chapter 8 - Operating Procedures
_______________________________________________________________________________________________________________
MNL000536
Revision 1
03/26/2018
BSGS eV / BULKGUARD eV
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
8
-
53
The “Gas Available” relay is energized.
“T Sw 2x2” will be displayed.
Process gas is now available to flow from the
source.
For operating all tubes simultaneously:
Press the START T SW All button to start the
Tube Switcher with all source tubes opened
simultaneously.
The Confirm Sequence Start window will be
displayed. Press the CONFIRM pushbutton.