Appendix E - Startup and Commissioning Checklist
_______________________________________________________________________________________________________________
MNL000542
Revision 1
03/26/2018
BSGS eV / BULKGUARD eV
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page APP
E
-
15
9. Closeout Section
Initials
or N/A
Date
A.
As-Built /redlined drawings have been put into Customer’s Operating Manual.
B.
Copies (hard or soft) of all documents shall be given to Customer / local Versum personnel.
C.
Copy (hard or soft) of this document shall be given to Customer / local Versum. personnel.
D.
Verify that all Operating Manuals, keys, safety documentation, and extra commissioning spare
parts are handed over to Customer or VERSUM MATERIALS, INC. Megasys Operations.
E.
Record all
Calibration Information
for all test equipment used. Record Make, Model Number,
Calibration Date, and Calibration Company for all equipment.
Digital Volt Meter:
Clamp-On Ammeter:
Insulation Resistance Tester (Megger):
4-20mA Calibrator:
Pressure PT Calibrator:
PT Modules:
F.
Document all changes or discrepancies from this procedure/checklist in the Notes Section on the
last page. Include as much detail as possible.