Chapter 8 - Operating Procedures
_______________________________________________________________________________________________________________
MNL000536
Revision 1
03/26/2018
BSGS eV / BULKGUARD eV
© Versum Materials, Inc. as of the revision and date shown. All rights reserved.
Confidential and Proprietary Data
Page
8
-
36
4.E Process Gas Flow
Purpose
: This Manual Sub-Section describes the AP11 Controller Program Routine that is used to
initiate process gas flow within the module.
The following table describes the steps to be followed when using the Process Gas Flow routine (On-
Line).
1.
Verify that the downstream process
equipment is ready to receive process gas.
2.
Verify that the manual process flow valves
in the system are open.
3.
Touch anywhere on the graphics portion
of the screen. Display will show a request
for password input.