4
Verify that your power cable connections match the connections in the following
diagram.
Turning on the hardware and verifying operation
The hardware components must be turned on in a specific sequence to ensure
correct communication between them.
The correct sequence is as follows:
68
Hardware installation procedures
Turning on the hardware and verifying operation