6
Slide the blue tab to unlock the rails and continue the sliding of the compute
node into the rack.
7
Secure the captive screws on the compute node ears.
Connecting the hardware to two nodes
This section provides cabling information for a Veritas Access 3340 Appliance that
includes two compute nodes, one Primary Storage Shelf, and up to three Expansion
Storage Shelves. If you have only one node you can disregard the instructions to
connect the two nodes.
Expansion Storage Shelves connect to the Primary shelf and to other Expansion
shelves with two SAS3 cables.
48
Hardware installation procedures
Connecting the hardware to two nodes