13
Install the medium-sized clamping screws from the outside of the rack posts
so that they engage the rails and the rack.
The front of the rail requires one clamping screw in the center hole of the center
RU.
The rear of the rail requires two clamping screws. Insert these screws in the
middle hole in the first and the fifth RU.
14
Remove any plastic film from the front and sides of the shelf.
Do not remove the front plate or bezel from either drawer.
34
Hardware installation procedures
Installing a storage shelf