Diagnostics and repair
88
LFXG-H Installation and Operation Guide
Maintenance and repair
Periodic maintenance schedule
Since the VEGA gauge contains no moving parts, very little periodic
maintenance is required. We suggest this schedule to prevent problems
and comply with radiation regulations:
Table 5.9
Periodic maintenance schedule
Description
Frequency
Procedure
Standardize
As required by process
conditions, usually at least once
a month
“Calibration” chapter
Source
holder
shutter
check
Every 6 months unless otherwise
required by the appropriate
nuclear regulatory body
Radiation safety instructions
shipped separately with
source holder and following
instructions
Source wipe
Every 3 years unless otherwise
required by the appropriate
nuclear regulatory body
Radiation safety instructions
shipped separately with
source holder and following
instructions
Summary of Contents for FiberFlex LFXG-H
Page 2: ......
Page 4: ...ii LFXG H Installation and Operation Guide NOTES...
Page 6: ...iv LFXG H Installation and Operation Guide...
Page 14: ...Preface xii LFXG H Installation and Operation Guide...
Page 34: ...Installation 32 LFXG H Installation and Operation Guide FiberFlex mounting...
Page 91: ...Diagnostics and repair LFXG H Installation and Operation Guide 89 Source Functions...
Page 100: ...98 LSGH Installation and Operation Guide NOTES...
Page 101: ......