10.1.8 Tributary Scan
This function requires VC12 or VT-1.5 mapping and allows for a quick check of the signal structure, trace identifier, and the
payload.
An important part of any Add Drop Multiplexer (ADM) installation process is the verification of the path routing. Considering that
an STM-1 contains 63 x VC-12’s and a STM-4 contains 252 x VC-12’s checking each path manually can be very time
consuming.
The unit automatically performs a sequential BER test on each SDH tributary (C12 channel) - mapping can be either via AU-4 or
AU-3. The unit checks for alarms in the received signal, the SDH structure, and for synchronization of the selected test pattern in
all channels. The result for each channel is entered in a table:
K.L.M.:
ITU-T Tributary numbering scheme
Report:
Pass (OK)
J2 trace:
Corresponds to the VT trace being transmitted
Label:
Corresponds to the V5 byte signal label being transmitted
Tributary Scan
10.1.9 Tandem Connection Monitoring Tasks (TCM)
HP Setup
RXT-3900 e-Manual D07-00-111P Rev A00
Summary of Contents for RXT3900
Page 1: ...RXT 3900 e Manual D07 00 111P Rev A00...
Page 19: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 50: ...RXT 3900 e Manual D07 00 111P Rev A00...
Page 74: ...RXT 3900 e Manual D07 00 111P Rev A00...
Page 75: ...RXT 3900 e Manual D07 00 111P Rev A00...
Page 119: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 240: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 282: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 294: ...Go back to top Go back to TOC 13 15 IP Monitoring RXT 3900 e Manual D07 00 111P Rev A00...
Page 296: ...Net Wiz Trace Route Setup Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 363: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...
Page 377: ...Go back to top Go back to TOC RXT 3900 e Manual D07 00 111P Rev A00...