188
Vehicle care
■ Apply the parking brake,
transmission in neutral, automatic
transmission in P.
■ Open the positive terminal
protection caps of both batteries.
Lead connection order:
1. Connect the red lead to the
positive terminal of the booster
battery.
2. Connect the other end of the red
lead to the positive terminal of the
discharged battery.
3. Connect the black lead to the
negative terminal of the booster
battery.
4. Connect the other end of the black
lead to a vehicle grounding point,
such as the engine block or an
engine mounting bolt. Connect as
far away from the discharged
battery as possible, however at
least 60 cm.
Route the leads so that they cannot
catch on rotating parts in the engine
compartment.
To start the engine:
1. Start the engine of the vehicle
providing the jump.
2. After 5 minutes, start the other
engine. Start attempts should be
made for no longer than
15 seconds at an interval of
1 minute.
3. Allow both engines to idle for
approx. 3 minutes with the leads
connected.
4. Switch on electrical consumers
(e.g. headlights, heated rear
window) of the vehicle receiving
the jump start.
5. Reverse above sequence exactly
when removing leads.
Summary of Contents for Mokka 2014
Page 3: ...2 Introduction Introduction ...
Page 6: ...Introduction 5 ...
Page 11: ...10 In brief Instrument panel overview ...
Page 84: ...Instruments and controls 83 Control indicators in the instrument cluster ...
Page 209: ...208 Technical data Towing hitch installation dimensions ...
Page 212: ...Customer information 211 ...